Town of Newstead

Building Department

Permit Requirements


  1. PERC test results, call Erie County @ 683-6487 (need house # from us first)
  2. Soil certification
    ...by your design professional or build to maximum requirements for worst soil condition. Load bearing value of soil in Newstead is 1,500 PSF.
    ...by our Building Inspector if under $20,000 and footing/basement less than 60" deep
  3. Completed Building Permit application
  4. Drainage Plan/Survey of property and plan showing proposed location of structure, first floor elevations, spot elevations (both existing and proposed), wetlands, flood plain, ditches, waterways, swales and runoff collection.
  5. Two sets of building plans with seal of design professional including energy calculations, description of materials and specifications.
  6. Plan Review Checklist completed by design professional.
  7. Driveway permit
    ...if a County road, call Erie County Highway Garage @ 759-8328
    ...if a Town road, we will notify Town Highway Garage and they will determine the need for and install a culvert pipe
  8. Builder's Certificate of Insurance must be on file with our office
  9. Payment of permit fee-based on cost of project.
    ***New home-based on square footage. Turnaround for plan review and fee calculation is about one week. Preliminary (unstamped) plans will not be reviewed without foundation plan.

  • Work site BEFORE permit
  • Footing BEFORE pouring concrete
  • Foundation BEFORE backfill
  • Framing BEFORE enclosing
  • Electrical BEFORE enclosing
  • Plumbing BEFORE enclosing
  • Heating, ventilation, A/C BEFORE enclosing
  • Insulation BEFORE enclosing
  • FINAL inspection BEFORE C/O